The study dealt with the integration between (TC) and (JIT) with the aim of reducing the material cost, represented in the cost of implementation, and the time cost represented in the risks of not implementing on time, with the aim of supporting competitive advantage and increasing profits, by identifying the aspects of this integration, then The possibility of applying to an Egyptian contracting ...